Importance of Tremie Concreting for Underwater concreting !!


Importance of Tremie Concreting for Underwater concreting !!

 Tremie concrete is commonly used in bored piling or drilled shaft construction to place concrete underwater or in situations where the concrete needs to be introduced from the bottom up. Using a tremie pipe in this process helps ensure the quality and integrity of the concrete within the drilled shaft. Here are the reasons why tremie pipe concrete is required in bored piling, along with some tremie concrete specifications:


Why Tremie Pipe Concrete is Required:

Prevents Segregation: When placing concrete in a deep borehole, the free fall of concrete from the top can lead to segregation, where the aggregates separate from the cement paste. This can result in a weakened and less durable concrete.


Tremie concreting.


Minimizes Water Intrusion: In situations where the borehole is filled with water or where the groundwater level is high, a tremie pipe allows concrete to be placed while minimizing the risk of water intrusion. The tremie pipe displaces water, and concrete is introduced from the bottom, pushing water upward.

Maintains Consistency: Using a tremie pipe helps maintain a continuous flow of concrete, ensuring uniform distribution and avoiding interruptions that could lead to cold joints or other construction issues.


Reduces Risk of Contamination: In cases where the borehole passes through contaminated soil or other materials, a tremie pipe minimizes the contact between the concrete and the surrounding materials, reducing the risk of contamination.

Tremie Concrete Specifications:


Concrete Mix Design: The concrete mix used in tremie applications should be designed to meet the structural requirements of the project. This includes considerations for strength, durability, and workability.

Slump: The slump of the concrete should be carefully controlled to ensure that it is fluid enough to flow through the tremie pipe but not excessively so. Typically, a higher slump concrete may be used for ease of placement.

Density: The density of the concrete is important, especially in cases where the borehole is filled with water. The concrete should have sufficient density to displace water effectively.





Use of Admixtures: Admixtures may be added to the concrete mix to control setting time, improve workability, or provide other specific properties suitable for the conditions encountered during tremie placement.

Tremie Pipe Specifications: The tremie pipe itself should be of appropriate diameter, length, and design to allow for efficient and continuous placement of concrete. The pipe should reach the bottom of the borehole to ensure that concrete is placed from the bottom up.


It's essential to follow project specifications, engineering guidelines, and relevant standards to ensure the proper design and execution of tremie concrete placement during bored piling. Local construction codes and standards, as well as project-specific requirements, should be consulted for precise specifications.